RedSealCarpenterExam

Sample questions: Carpenter exam

RedSealCarpenterExam · Topics · Exam guide · Sample questions

Practice questions written by us, with the correct answer and the rule cited. They are not official questions.

1. When should the receiver tank of a portable air compressor be drained of condensed water?

  1. Once a year, at the annual inspection by a technician
  2. After use, per the manufacturer's specifications
  3. Whenever the safety valve has released pressure
  4. After the air hose has been repaired or replaced

Criterion A-1.01.10P of RSOS sub-task A-1.01 has the tank drained after use according to the manufacturer's specifications, which prevents corrosion of the tank and damage to tools. An annual inspection leaves water in the tank for months, a hose repair has no bearing on condensation, and a safety-valve release signals a fault rather than a draining schedule.

2. Which heading of a safety data sheet gives the conditions for safe storage of an adhesive, including incompatibilities?

  1. Handling and storage
  2. Transport information
  3. Disposal considerations
  4. Regulatory information

The heading Handling and storage in Schedule 1 to the Hazardous Products Regulations covers precautions for safe handling and the conditions for safe storage, including incompatibilities (RSOS sub-task B-5.03). Disposal considerations deal with discarding the product, transport information with shipping, and regulatory information with the rules that apply to it.

3. A straight foundation wall is 9.5 m long, 2.4 m high and 250 mm thick on a metric job, and 30 ft. long, 8 ft. high and 10 in. thick on an imperial job. What concrete volume fills the wall form?

  1. Metric: 5.7 m³, Imperial: 7.4 cu. yd.
  2. Metric: 0.57 m³, Imperial: 0.74 cu. yd.
  3. Metric: 57 m³, Imperial: 22.2 cu. yd.
  4. Metric: 5 700 m³, Imperial: 200 cu. yd.

Volume equals length × height × thickness (RSOS sub-task C-8.04, concrete volume requirements): metric, 9.5 × 2.4 × 0.25 = 5.7 m³; imperial, 30 × 8 × (10 ÷ 12) = 200 cu. ft., and 200 ÷ 27 = 7.4 cu. yd. The smallest pair slips the decimal point in the thickness (0.025 m and 0.083 ft.). 57 m³ and 22.2 cu. yd. use wrong conversion factors (250 mm ÷ 100, and cubic feet ÷ 9 instead of ÷ 27), and 5 700 m³ and 200 cu. yd. leave a conversion out (the thickness kept as 250, and the cubic feet never divided by 27).

4. What minimum undamaged depth must remain when a hole is drilled through a loadbearing wall stud that is not reinforced?

  1. One-third of the stud depth
  2. One-half of the stud depth
  3. A fixed 40 mm (1 9/16 in.)
  4. Two-thirds of the stud depth

Article 9.23.5.3. of the NBC (NBC 2020 and 2025) says the undamaged portion of a loadbearing stud must be at least two-thirds of its depth, unless the weakened stud is reinforced (RSOS sub-task D-12.02). The 40 mm value belongs to non-loadbearing studs and does not apply to a loadbearing stud. One-half and one-third would leave a stud too weak to carry its load.

5. How is the underlay laid on a roof before asphalt shingles are installed?

  1. Lay it up the slope from the eaves with head and end laps of at least 50 mm (2 in.).
  2. Lay it parallel to the eaves with head and end laps of at least 50 mm (2 in.).
  3. Lay it parallel to the eaves with head and end laps of at least 25 mm (1 in.).
  4. Lay it parallel to the eaves with butted heads and ends, taped at each joint.

Sentence 9.26.6.2.(1) of the NBC (NBC 2020 and 2025) has underlay installed parallel to the eaves with head and end laps of at least 50 mm (RSOS sub-task E-15.01). Strips run up the slope would let water run along the joints, a 25 mm lap is half of the required lap, and butted joints do not provide the lap that sheds water.

6. How are tongue-and-groove wood boards nailed so that the nail heads are hidden?

  1. Face-nailed at the centre of each board with finish nails
  2. Stapled through the face at each support and filled with putty
  3. Blind-nailed through the tongue at an angle into each support
  4. Nailed through the groove edge with the heads left standing out

Blind nailing is done through the tongue at an angle into each support, and the next board's groove covers the nail head (RSOS sub-task F-17.03, secure solid wood finishes with fasteners). Face nails and staples show on the finished surface and need filling. Nails through the groove edge with the heads left standing out would stop the next board from seating.

7. Where the side of a new roof slope runs along an existing wall that rises above it, what keeps water out of the joint?

  1. A heavy caulking bead along the wall above the shingles
  2. Step flashing under the wall membrane and over the shingles
  3. Wall cladding carried down tight onto the shingle surface
  4. A strip of roofing felt nailed flat over the shingle edge

RSOS sub-task G-22.01 requires exterior components such as flashing and cladding to be installed so that the transition from new to existing is weatherproof. Step flashing is lapped under the wall's membrane and over each shingle course, so water runs onto the roof and not into the joint. Caulking alone ages and cracks, cladding carried onto the shingles traps water, and a flat strip of felt sends water behind the shingles.

8. A carpenter attends a morning safety meeting where a new delivery route is announced. What should the carpenter do with the information afterward?

  1. Wait for a written notice before changing any work habits.
  2. Keep it private until the supervisor asks for it.
  3. Relay it to absent crew members and apply it to the work.
  4. Mention it to others if it happens to come up later.

RSOS sub-task A-4.01 expects meetings to be attended, the information relayed to the workforce and then applied. Keeping it private or waiting for a notice delays the change and leaves absent workers unaware of the route. Mentioning it only by chance does not make sure that everyone receives it.

9. Where is the best place to stage a delivery of framing lumber on a tight site?

  1. Beside the open excavation, on its unsupported edge
  2. Behind the temporary fence, in the lowest part of the lot
  3. Across the main access road so the crane can reach it
  4. On level, well-drained ground close to the work area

RSOS sub-task B-6.02 sets up storage by considering accessibility, crane location, the safety of workers and security. Level, drained ground near the work meets those needs. Low ground collects water, blocking the access road stops deliveries and traffic, and loading the edge of an excavation can cause a collapse.

10. Which sequence is correct when setting a precast panel on its bearing?

  1. Set it on shims, align it, brace it, then release the hook.
  2. Brace it, set it on shims, release the hook, then align it.
  3. Align it with the hook released, then set the shims and brace it.
  4. Set it on shims, release the hook, then align and brace it.

RSOS sub-task C-9.04 has the precast components aligned, shimmed and braced, and the crane must hold the panel until it is stable. Releasing the hook before bracing leaves an unsupported panel that can fall. Bracing before the panel is on its shims cannot work, and aligning the panel after the hook is released leaves no way to move it safely.

11. How is a long-span engineered truss lifted by crane without bending it sideways?

  1. Lift it upright at the midpoint of the bottom chord, using a single sling.
  2. Lift it upright at the pick points on the top chord, using a spreader bar.
  3. Lift it flat on its side at the two ends, using a pair of choker chains.
  4. Lift it upright at the peak joint, using a short sling and a tag line.

Correct answer: Lift it upright at the pick points on the top chord, using a spreader bar. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the RSOS sub-task it is based on.

12. After wind-driven rain, water shows at the lower corners inside a window. The sill membrane was lapped over the jamb membrane. What is the likely cause?

  1. The frame has too much clearance in the rough opening of the wall
  2. The sill membrane was sloped slightly toward the exterior
  3. The sill membrane is reverse lapped, so water runs behind it
  4. The siding was nailed tightly and cracked at the corners

Correct answer: The sill membrane is reverse lapped, so water runs behind it. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the RSOS sub-task it is based on.

13. How are treads and risers secured in a housed stringer?

  1. Nail them to the face of the stringer, then fill the nail holes.
  2. Rest them on cut-out notches and toenail them to the stringer.
  3. Screw them to the stringer through the faces of the risers.
  4. Slide them into the routed housings and tighten them with glued wedges.

Correct answer: Slide them into the routed housings and tighten them with glued wedges. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the RSOS sub-task it is based on.

14. An exterior wall is left open overnight and rain is forecast. How is the opening covered?

  1. Tarp fixed above the opening and lapped over the wall below
  2. Tarp stapled at the bottom edge and left loose at the top
  3. Tarp laid on the floor inside and tucked against the wall
  4. Tarp taped flat across the opening with no overlap on the wall

Correct answer: Tarp fixed above the opening and lapped over the wall below. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the RSOS sub-task it is based on.

15. How many numbered headings must the safety data sheet of a solvent-based adhesive have under the Hazardous Products Regulations?

  1. 9 headings, as on the former MSDS
  2. 16 headings, in a fixed order
  3. 12 headings, grouped by hazard type
  4. 20 headings, one per hazard class

Correct answer: 16 headings, in a fixed order. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the RSOS sub-task it is based on.

16. To mark the plumb cut of a common rafter on a 6 in 12 roof, a carpenter draws along the tongue of a framing square set on the edge of the stock. Where are the numbers set?

  1. 12 in. on the tongue and 12 in. on the blade
  2. 12 in. on the tongue and 6 in. on the blade
  3. 6 in. on the tongue and 12 in. on the blade
  4. 6 in. on the tongue and 24 in. on the blade

Correct answer: 6 in. on the tongue and 12 in. on the blade. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the RSOS sub-task it is based on.

17. What sets the order and timing of form removal on a project?

  1. The amount of time the crew has available that day
  2. The first day the surface of the concrete looks dry
  3. A fixed period of 24 h after the pour has ended
  4. The stripping schedule in the specifications

Correct answer: The stripping schedule in the specifications. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the RSOS sub-task it is based on.

18. How are floor joists supported when they are framed into the side of a wood beam?

  1. On joist hangers or on ledger strips nailed to the beam.
  2. On a strip of plywood that is stapled to the beam side.
  3. On toe-nails driven through the joists into the beam.
  4. On the subfloor panels that are nailed to the beam top.

Correct answer: On joist hangers or on ledger strips nailed to the beam. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the National Building Code article it is based on.

19. Which tool is best suited to cut hinge gains in the edge of an exterior door slab?

  1. Circular saw set to the depth of the hinge
  2. Jigsaw guided along a pencil outline
  3. Router with a hinge-mortising template
  4. Reciprocating saw fitted with a wood blade

Correct answer: Router with a hinge-mortising template. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the RSOS sub-task it is based on.

20. How is solid wood strip flooring acclimatized before installation?

  1. Store it in the building at normal service conditions until its moisture content stabilizes.
  2. Store it outdoors under a tarp so surplus moisture can escape before installation.
  3. Store it in a heated room well above service temperature to dry it before installation.
  4. Open the cartons and install the boards immediately to limit moisture uptake.

Correct answer: Store it in the building at normal service conditions until its moisture content stabilizes. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the RSOS sub-task it is based on.

21. Which step comes first when planning the removal of materials in an older house?

  1. Start removing finishes in the largest room first.
  2. Remove the doors and windows to clear the walls.
  3. Strip the exterior cladding to expose the framing.
  4. Assess the existing structure for hidden conditions.

Correct answer: Assess the existing structure for hidden conditions. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the RSOS sub-task it is based on.

22. What is the correct way to keep a straight ladder from shifting while workers climb it?

  1. Lean the top against a plastic drain pipe for support.
  2. Tie it off at the top and set the feet on firm ground.
  3. Level the feet with loose bricks stacked under one rail.
  4. Set it at a shallow angle so it cannot tip backward.

Correct answer: Tie it off at the top and set the feet on firm ground. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the RSOS sub-task it is based on.

23. Which layout structure gives a fixed point of known elevation that grades are measured from on a site?

  1. A batter board
  2. A benchmark
  3. An iron pin
  4. A flagged nail

Correct answer: A benchmark. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the RSOS sub-task it is based on.

24. What is used to identify the lifting points on a precast concrete panel?

  1. The reach and capacity of the crane on site
  2. The estimate of the balance point by the operator
  3. The weight of the panel written on the plant tag
  4. The engineered drawings and specifications

Correct answer: The engineered drawings and specifications. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the RSOS sub-task it is based on.

25. Why is a gap left between the decking boards when they are installed?

  1. To let the boards bend more easily around the guard posts.
  2. To reduce the number of fasteners needed along each joist.
  3. To let water drain and allow the boards to move with moisture.
  4. To hide the differences in width between the boards.

Correct answer: To let water drain and allow the boards to move with moisture. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the RSOS sub-task it is based on.

26. Vinyl panels are cut to fit into J-channel on a cool day. How are the panel ends set?

  1. Set with the gap the maker specifies for the air temperature
  2. Fixed in place with sealant so that the ends cannot slide out
  3. Pushed to the back of the channel to prevent air leakage
  4. Left with one fixed gap whatever the air temperature is

Correct answer: Set with the gap the maker specifies for the air temperature. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the RSOS sub-task it is based on.

27. A new interior window is to be set in an opening whose sill is slightly out of level. How should the carpenter set the unit?

  1. Pack the head with shims to match the slope of the sill.
  2. Fasten the unit to follow the sloping sill so it fits tight.
  3. Plane the bottom of the unit until it sits on the opening.
  4. Shim the sill until the unit is level, then check plumb and square.

Correct answer: Shim the sill until the unit is level, then check plumb and square. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the RSOS sub-task it is based on.

28. What is the purpose of a void form placed under a grade beam?

  1. To let water drain away from the underside of the beam
  2. To level the beam forms to the elevation on the drawings
  3. To leave a gap so frost heave cannot lift the beam
  4. To make the beam lighter by leaving out extra concrete

Correct answer: To leave a gap so frost heave cannot lift the beam. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the RSOS sub-task it is based on.

29. An exterior wall of sheet steel studs has an opening 3 000 mm (9 ft. 10 in.) wide. How are the studs framed at each side of the opening?

  1. Three studs fastened together to act as a single unit
  2. A single stud on each side, supported by a runner
  3. Two studs fastened together to act as a single unit
  4. Three studs set one stud space apart and braced

Correct answer: Three studs fastened together to act as a single unit. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the National Building Code article it is based on.

30. How are I-joists kept from rolling over before the subfloor panels are installed?

  1. Fasten temporary bracing across the webs and remove it daily.
  2. Fasten temporary bracing across the top flanges and tie it off.
  3. Nail the rim board at the ends and leave the span unbraced.
  4. Stack the subfloor panels on the span to hold the joists down.

Correct answer: Fasten temporary bracing across the top flanges and tie it off. Premium access includes the full explanation (why this answer is right and why the other options are wrong) and the RSOS sub-task it is based on.

Take the free test · full question bank and mock exams with a subscription