RedSealCarpenterExam

🏠 Exterior Finishing

What this topic covers

Major Work Activity E of the RSOS Carpenter 2022, Performs exterior finishing, accounts for 14 questions out of 100: task E-14 Installs exterior doors and windows (5), E-15 Installs roofing (4) and E-16 Installs exterior finishes (5). These are original study notes, not documents of the Red Seal Program, the CCDA, ESDC or any province. Code values refer to the National Building Code of Canada 2020, the edition supplied at the exam; a value that changes in the NBC 2025 is given with both editions. Health and safety rules and CSA standards vary by province and manufacturer: work according to jurisdictional regulations and manufacturers' specifications.

Openings and exterior doors

Window weather protection

Roofing

Wall membranes and cladding

Take the free test · full question bank and mock exams with a subscription

Sample questions (10)

1. What is the term for the framed opening in a wall into which an exterior door frame is set?

  1. Clear opening
  2. Daylight opening
  3. Rough opening
  4. Egress opening

RSOS sub-task E-14.01 has the carpenter assess and adjust rough openings, which are the framed holes left larger than the frame so it can be shimmed. The clear opening is the unobstructed passage left once the door is installed. The daylight opening is the glazed area of a unit, and an egress opening is one sized for emergency escape.

2. How are shims placed at each fastening point when an exterior door frame is set plumb in the rough opening?

  1. Slide pairs of tapered shims in from opposite sides.
  2. Nail a single shim flat against the outside of the frame.
  3. Staple a continuous strip of shim along the jamb.
  4. Glue short shims to the face of the jamb trim.

RSOS sub-task E-14.01 has jambs and frames secured by shimming and fastening. Two opposed tapered shims form a flat packer that can be adjusted until the jamb is plumb, and it gives solid bearing behind each fastener. A single shim nailed outside the frame, a continuous strip or shims glued to the trim do not support the jamb at the fastener, so the jamb can bow or shift.

3. How is a rectangular rough opening for an exterior door checked for square before the frame is set?

  1. Compare the opening width at the top and at the bottom.
  2. Measure both diagonals and confirm that they are equal.
  3. Place a level on the header and read the bubble.
  4. Compare the height on each side with the frame height.

RSOS sub-task E-14.01 lists out-of-square openings among the pre-existing conditions to assess and adjust. An opening is square when its two diagonals measure the same. Equal widths or equal heights do not prove squareness, because a racked opening can have equal opposite sides, and a level on the header shows only whether the header is level.

4. What should the carpenter consult first to confirm the swing of an exterior door before the slab is hung?

  1. The door schedule and the project drawings
  2. The direction of the nearest interior door
  3. The side of the wall with the most framing
  4. The handing stamped on the lockset carton

RSOS sub-task E-14.02 has the swing of a pedestrian door determined from the door schedule, the codes, the drawings and the project requirements. The schedule and drawings fix the hand and direction of swing at each opening. Neighbouring doors, the framing layout or the lockset packaging do not reflect the design and can produce a door that swings the wrong way.

5. Which sequence is used to set a pre-hung exterior door in a rough opening that already has a sill membrane?

  1. Seal the sill, set the unit, fasten the latch side, then plumb the hinge side.
  2. Seal the sill, set the unit, fasten the head jamb, then plumb the hinge side.
  3. Set the unit, seal the sill, plumb the hinge side, then fit the latch side.
  4. Seal the sill, set the unit, plumb the hinge side, then fit the latch side.

RSOS sub-task E-14.02 has the door secured to the jamb according to the manufacturer's specifications. The standard sequence seals the sill first, sets the unit, plumbs and fastens the hinge side, then fits the latch side to an even margin. Sealing after the unit is set leaves no seal under the sill, and fastening the latch side or the head first fixes the frame before the hinge side is plumb.

6. Where is solid blocking placed behind the jambs of the swinging front door of a house to resist forced spreading?

  1. Across the head of the frame above the door
  2. On both sides of the frame at lock height
  3. Under the threshold at the sill plate
  4. Along the full height of the hinge-side jamb

When an entrance door is installed (RSOS sub-task E-14.02), Sentence 9.7.5.2.(9) of the NBC (NBC 2020 and 2025) adds solid blocking between the jambs and the framing, on both sides, at the height of the lock. A pry bar is applied at the lock, so blocking there keeps the jambs from spreading and releasing the bolt. Blocking at the head, under the threshold or along the hinge-side jamb does not back up the lock area.

7. Which product is used to fill the gap between an exterior window frame and the rough opening?

  1. Low-expansion foam for windows and doors
  2. Cement-based grout trowelled into the gap
  3. Fibreglass batt compressed tightly into the gap
  4. High-expansion foam applied in a single pass

RSOS sub-tasks E-14.03 and E-14.01 have the carpenter install weather protection and insulate the cavity around frames to form a thermal break. Low-expansion foam made for windows and doors fills the gap without pushing on the frame. High-expansion foam bows the jambs and makes the sash bind, grout is rigid and cracks when the frame moves, and a compressed batt loses its insulating value.

8. In what order are the weather protection layers applied around the rough opening of a window?

  1. Sill membrane first, then jamb membranes, then head flashing
  2. Head flashing first, then jamb membranes, then sill membrane
  3. Jamb membranes first, then head flashing, then sill membrane
  4. Sill membrane first, then head flashing, then jamb membranes

Weather protection at a window (RSOS sub-task E-14.03; Article 9.7.6.2. of the NBC sends flashing to Articles 9.27.3.7. and 9.27.3.8.) is built from the bottom up in shingle fashion. The sill goes first, the jamb membranes lap over it, and the head flashing laps over the jambs, so every upper layer sheds water onto the layer below. The other orders put an upper layer behind a lower one and direct water into the wall.

9. Why is the sash of a new window opened and closed before the final weather protection is completed?

  1. To break in the factory weather stripping before the cladding is installed
  2. To loosen the hinges so they can be retightened after the trim goes on
  3. To cure the low-expansion foam faster by exposing the joint to air
  4. To check latching, spacing and alignment while shims can still be adjusted

RSOS sub-task E-14.03 has the carpenter verify operation, which includes latching, spacing, alignment and clearances. A binding or misaligned sash shows that the frame is racked or bowed, and it is much easier to fix while the shims can still be adjusted. Breaking in the weather stripping, loosening the hinges or curing the foam are not reasons for the check.

10. Water enters the wall framing below the lower corners of a new window although the head flashing laps correctly over the jamb membranes. What is the most likely cause?

  1. The sill membrane was not carried up the jambs at the corners
  2. Low-expansion foam was used around the frame at the sill
  3. The jamb membranes were lapped over the sill membrane
  4. The sash was left unlatched while the frame was being fastened

Water that runs down the jambs must land on a sill membrane that is carried up and sealed at the jamb corners (RSOS sub-task E-14.03). Without that turn-up, water reaches the framing at the lower corners even when the head flashing is correct. Low-expansion foam and jamb membranes lapped over the sill are correct practice, and a sash left unlatched during fastening does not open a path for water into the wall.

Start free

RedSealCarpenterExam · Topics · Exam guide · Sample questions